Sewage Pumps
Above ground installation of a Positive Displacement Pump (PDP). Original cubicles re-used and electrical control cubicle on right hand side.
A very neat and clean installation of new macerator pump over a below ground wet well
Rectangular biological filter beds 159 m long with a total capacity of 23,400 cu.m.

Conversion of an existing submersible pumping station to be adopted by a Water Company
General views of site and inside electrical control cubicle & telemetry system.

View inside concrete pump wet well showing two pumps and central over pumping facility
plus pump electrical float controls.
Underground Pumping Station NOT to be Adopted by a Water Company
General view of pumping station showing wet well
valve chamber and cubicle housing electrical controls

View in underground valve chamber
View of electrical control panel inside cubicle
View inside pumping station (Duty / Standby PD pumps and single Macerator, plus electrical control panel)
We thank all contributors for the permission to use their photographs but if there are any person/companies which should be recognised and thanked please advise us as soon as possible and this will be corrected.